April 20 - 23, 2015    Miri , マレーシア
6-stage hazard studies have shown that they can improve process safety and enhance project management from concept through design and construction to operation – they give better financial control, better time management and reduce last minute changes. The system allows critical issues to be identified and resolved early in the life of a project, reduces reliance on HAZOP at too late a stage in the design and provides a framework for incorporating health, safety and environmental issues.

開催地

Location: Miri Indoor Stadium
連絡先 Jalan Sukan, 98000 , Sarawak, Malaysia Miri , Malaysia

主催者

Institution of Chemical Engineers
Unit A-27-3A, Level 27, Tower A Menara UOA Bangsar 5, Jalan Bangsar Utama 1 59000 Bangsar Kuala Lumpur Malaysia
60322831381

関連イベント

6-Stage Hazards - Malaysia April 20 - 23, 2015