Wind Turbine Blade Manufacture 2011
December 6 - 8, 2011
杜塞尔多夫 , 德国
The 2nd AMI international conference on Wind Turbine Blade Manufacture 2011 .There is a welcome reception and registration on the first evening followed by a 2-day programme of presentations. A small exhibition accompanies the conference.
This conference brings together energy companies, wind turbine producers, blade manufacturers, design engineers, composites manufacturing experts, researchers, developers, materials and equipment suppliers, to discuss the latest challenges from climactic conditions, design, materials and composites processing, to qualification and testing.
This conference brings together energy companies, wind turbine producers, blade manufacturers, design engineers, composites manufacturing experts, researchers, developers, materials and equipment suppliers, to discuss the latest challenges from climactic conditions, design, materials and composites processing, to qualification and testing.
相关活动
Wind Turbine Blade Manufacture December 3 - 5, 2013
Wind Turbine Blade Manufacture November 27 - 29, 2012
Wind Turbine Blade Manufacture December 6 - 8, 2011
Wind Turbine Blade Manufacture December 7 - 9, 2010